skip to main
|
skip to sidebar
Passive House
Tuesday, February 19, 2008
Ventilation and Heating System
The ventilation and heating system was installed from November 2007 to January 2008.
The heat pump and boiler.
Air is circulated around the house through pipes in the ceilings and walls.
Underfloor heating pipes in the main bathroom.
Silencers stop noise travelling from room to room.
Heating pipes in the walls. These are only necessary in a few places.
178 comments:
Post a Comment
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
▼
2008
(2)
▼
February
(2)
Ventilation and Heating System
The Clay Walls
►
2007
(18)
►
November
(2)
►
October
(3)
►
September
(2)
►
July
(6)
►
June
(2)
►
March
(1)
►
February
(1)
►
January
(1)
About Us
Our family...
... consists of Peter and Emma and our children, Alexander (aged 5) and Adam (aged 1).
View my complete profile
178 comments:
Post a Comment