On a scorching hot day the team of architect, builders and carpenters put up the ground-floor frame.

The pre-fabricated walls arrive by lorry.

Unloading the first wall.

Bjorn, the architect, (centre) discusses details with the windows and insulation people.

Marian, the building contractor, in the foreground.


Peter

The bolts and staples used to attach the frame to the foundations.
No comments:
Post a Comment